Give Music Inc

Give Music IncGive Music IncGive Music Inc

Give Music Inc

Give Music IncGive Music IncGive Music Inc
  • Home
  • About
  • V3NU:846
  • History
  • The Build
  • More
    • Home
    • About
    • V3NU:846
    • History
    • The Build
  • Home
  • About
  • V3NU:846
  • History
  • The Build
Hello

How can you help us build V3NU:846?

There's much to be done for V3NU:846.  So, take your time, look around, and see if there is an area where you would like to support.  Volunteer labor, donate equipment or furniture or even buy a box of nails!  Everything can help.  Let's do this!  If you are unsure of where or how you can contribute, drop us a line.  

Phase 1

Intro to our first location!  (Part 1 of 3)

Phase 2

Gallery & event space (Part 2 of 3)

phase 3

Parkour Park & Exterior wall Mural space

Give Music Inc.

26 1/2 Mattoon St, Springfield, Massachusetts 01105, United States

Contact Us

Cancel

V3NU:846 needs list

Main Room

Hours and items still needed for the main event space. Volunteer hours/ dollars or items welcome!

General Construction Labor

480 Hours

Dry wall, painting and wood working labor.  Stage building, laying wood and epoxy flooring.  Finalizing walls and ceiling, clean up.

General Construction items

$10,000

Nails, screws, paint, insulation, wood flooring, epoxy flooring, exterior doors, pendant lighting.

Masonry Labor

80 Hours

Cutting exterior walls for new entry ways.  Altering existing brick/ concrete block support beams.

Electrical Labor

80 Hours

New 200Amp breaker box.  Addition of CamLock 200AMP service.

Electrical items

$4,000

CamLock 200AMP main switch, cable

Plumbing labor

120 Hours

New Restroom & Kitchen plumbing (concrete floor)

Plumbing Items

$3500

New Restroom & Kitchen sinks, toilets, drains, etc.

HVAC Labor

40 Hours

Install new 5 ton and 1 ton AC/Heating system

HVAC Items

$25,000

5 ton & 1 ton unit with ducts

Furnishings

$16,500

Tables, Chairs, Desks, Sound panels, etc.

Sound System

$60,000

Line array, monitors, mics, consoles, etc.

Sound System Labor

80 Hours

Install, update, tune, program

Lighting System

$60,000

Spots, beams, strobes, FX, console, etc.

Lighting System Labor

80 Hours

Install, update, design

Video System

$60,000

Tv's LED Screen, Resolume, etc.

Video System Labor

120 Hours

Install Tv's LED Screen, Resolume, etc.


Galleries

Gallery items and labor needed

Electrical items

$1000

Track lighting

Misc.

$1000

Various items for gallery usage.


Training room

Items and labor needed to main training room

Wall mirrors

TBD

Add a description about this item

Wood floor

TBD

Wood floor for studio

Sound panels

TBD

Sound absorption materials

Audio recording equipment

$50,000

Digital recording studio equipment

More to come as we continue to build.


Copyright © 2020 Give Music Inc - V3nu:846 - All Rights Reserved.

Powered by GoDaddy Website Builder

  • About
  • V3NU:846
  • History